Without wanting to minimize the extent of what happened, Weco srl, called in the last 5 months like many production companies to a great social and economic responsibility, has never stopped working and in this period in addition to developing new projects and new strategies for the future, it has also finished building the new headquarters in Cittadella. 

After 21 years, the company Weco srl, manufacturer of systems and software solutions for the professional welding market, leaves the offices in Via S. Antonio in  Belvedere di Tezze (VICENZA) and moves to the new plant in Cittadella (PADOVA), in a modern 2-storey building of 6000 square meters covered. 

 

 

It is a building with high technological standards, liveability and sustainability, the latter understood as attention to the environment but also to people. In the conception of the new headquarters, various measures were used that reduce the environmental impact in terms of energy efficiency: in different points of the plant there are recharging stations to favor the use of electric cars and there is a system of photovoltaic panels with energy storage solar through batteries that guarantee energy autonomy (the technology was developed by the subsidiary Delios srl, a start-up in the renewable energy sector based in Cittadella next to the new Weco plant).  

One of the many solutions created by Weco to make its employees feel “at home” was to prefer open spaces and to delimit the offices with windows, so that natural lighting penetrates everywhere. 

The production departments have been equipped with underfloor heating, air conditioning and large windows to ensure natural light throughout the day, provide an optimal environment and reduce energy consumption. 

WE LOOK FORWARD TO WELCOMING YOU! 

Our New contact details:
WECO Srl, Corso Noblesville, n. 8, 35013, Cittadella, (Padova) Italy 
Tel.+39 049 7301120